On a new build, the electrical work runs in this order: the plans and an approximate price, the penetrations, a point check and the boxes, the cabling, a last point check, the openings before stopping, fit-off in two rounds, then checking and commissioning. From the penetrations to the last point check is the cabling part, or rough-in; the fitting part, or fit-off, begins once the walls are lined. Our new build work follows this order.
The stages at a glance
| Stage | What happens |
|---|---|
| Plans | We look at the plans and give an approximate price; a formal quote follows |
| Penetrations | Where cables pass through the outside walls: outdoor lights, outdoor sockets, the mains cable, the main earth and the fibre |
| Point check and boxes | We check the point positions with you, then fix the boxes and drill the holes |
| Cabling | The cables are run |
| Last point check | We check the points with you one last time, and the cabling part is done |
| Before stopping | Light holes and other openings, best cut before stopping |
| Fit-off, first round | For power on quickly or the temporary supply out: as far as possible, the switchboard, earth rod, switches, sockets and lights |
| Fit-off, second round | The kitchen, bathrooms and other special appliances |
| Checking and commissioning | Every circuit tested; you receive copies of the certificates |
The plans and an approximate price
Everything starts with the plans. We look at them first and give an approximate price; a formal quote follows. The points are counted from the plans, room by room: every switch, socket and light point, with the switchboard and circuits, the outdoor points and whole-house items, and you confirm the room-by-room list before work starts. If the electrical layout is not drawn yet, we make the list with you from the floor plan.
Send the current plans as PDFs, with the electrical or lighting plan if there is one, and say which revision they are. An appliance list helps too: ovens, hobs, rangehoods and heat pumps may each need their own circuit, and their installation instructions state the supply they need.
Decisions at this stage are changed on the plan, not on site:
- where each switch, socket and light point goes, room by room
- the type of each light: downlights, pendants, wall lights or LED strip lighting; for strip, see the LED strip lighting guide
- which lights dim, and which are switched from two places, such as stairs and long hallways
- data points and TV points, and where the router or network cabinet goes
- outdoor lights and sockets
- provision for later, such as a cable or conduit for a future EV charger; see the home EV charger checklist
Rough-in: from the penetrations to the last point check
The cabling part is done before the walls are lined:
- Penetrations. First come the penetrations, where cables pass through the outside walls: for the outdoor lights, the outdoor sockets, the mains cable, the main earth and the fibre.
- Point check and boxes. We check the point positions with you, then fix the boxes and drill the holes.
- Cabling. We run the cables.
- Last point check. We check the points with you one last time, and the cabling part is done.
At both point checks, walk the house and look at:
- the switch positions beside each door
- socket positions and heights, in particular above benches and behind TVs and beds
- light positions against the furniture plan: over the island, the dining table, the bed
- data and TV positions
- LED strip runs and driver positions
Before the linings go up, take photos of every wall. They show where the cables run, which helps anyone fixing to those walls later.
Before stopping: light holes and openings
Once the walls are lined, the fitting part begins. The light holes and the other openings needed are best cut before stopping. If one is cut wrongly, it is patched, and the stopper fills over it with the rest of the stopping.
Fit-off in two rounds
Fit-off then runs in two rounds:
- First round. If you want the power on quickly, or the temporary supply taken away, the first round completes, as far as possible, the switchboard, the earth rod, the switches, the sockets and the lights.
- Second round. The kitchen, the bathrooms and other special appliances follow.
Light fittings you supply need to be on site, marked by room, before the first round. Appliances need to be on site, with their installation instructions, before the second.
Checking, commissioning and the certificate
Last comes checking and commissioning: every circuit is tested.
WorkSafe notes that the law also requires some electrical work to be inspected, particularly work on the main switchboard, the main cable and the main earth, and that the electrician you employ is responsible for arranging a licensed electrical inspector to carry out the inspection. On a new build we arrange it before the power goes on. Under regulation 74A(5) of the Electricity (Safety) Regulations 2010, the Electrical Safety Certificate counts, for section 19(1)(e) of the Building Act 2004, as a certificate that the prescribed electrical work done on the installation complies with the building code. WorkSafe calls the Certificate of Compliance an important document that may be required when you sell the home.
Changes along the way
Plans can change during a build, and each change is easier at some stages than at others. A point is easy to move on the plan and harder once the walls are lined, when the lining has to be opened at that point. Every change after the room-by-room list is confirmed is recorded against it, with its price, and you confirm it before the work is done. Ask for changes in writing, and keep the confirmed list and every change together, so the final invoice can be checked line by line.
FAQ
When should the electrician see the plans?
First, before any electrical work on site. You or your builder send them, and we look at them and give an approximate price; a formal quote follows. The room-by-room list is made from the plans too.
When are the power points checked on a new build?
Twice, with you: before the boxes are fixed and the holes drilled, and once more when the cabling is done. Both checks come before the walls are lined, while a point can still be moved easily.
What are rough-in and fit-off?
Rough-in is the cabling part: the penetrations, the point checks, the boxes and the cables, all before the walls are lined. Fit-off is the fitting part, once the walls are lined: the switchboard, switches, sockets, lights and appliances go in, in two rounds.
When can the power go on?
If you want the power on quickly, or the temporary supply taken away, the first round of fit-off completes, as far as possible, the switchboard, the earth rod, the switches, the sockets and the lights. Before the installation is connected, regulation 73A of the Electricity (Safety) Regulations 2010 requires the person connecting it to issue or sight a Certificate of Compliance where the work needs one and, where the work must be inspected, to complete or sight a record of inspection.
Can you fit light fittings I have bought?
Yes. Send the model or its specifications, and have the fittings on site, marked by room, before the first round of fit-off, when the lights go in. As with any lighting installation, dimmable fittings are matched to their dimmers before the list is confirmed.
