Adams Apple ElectricalRegistered Electrician in Auckland

Blog

What to send an electrician for a quote

The address, what you want done, plans or photos and your timing: what we need to quote from plans or photos, or to plan a site visit.

Updated 2026-11-13

What to send an electrician for a quote

What to send an electrician for a quote comes down to a few things: where the job is, what you want done, and plans or photos that show it. With those, we quote from the plans or photos, or arrange a site visit when they do not show enough.

The short list

  • Address: where the job is, and the type of building: house, apartment, shop, office or warehouse.
  • What you want done: room by room, if you can.
  • Plans or photos: plans for new builds and renovations, photos for smaller jobs.
  • The switchboard: a photo with its door open, and one of the meter.
  • Timing: when you need it done, and any fixed date, such as a builder's programme or an opening day.
  • Access: who lets us in, parking, pets, alarms, and any building rules on contractor hours or lift bookings.
  • Contact: the name and number of the person who decides.

Describe it room by room

Every job of ours starts with a room-by-room list of every switch, socket and light point, which you confirm before we start. A description in the same form gets a quote that matches it:

  • Kitchen: two double sockets above the bench, the oven point moved, four downlights on a dimmer.
  • Bedroom 1: a double socket each side of the bed, a data point by the desk.
  • Outside: two wall lights by the back door, one outdoor socket.

Say what is changing as well as what is new: points that move, points that go, and anything that stays as it is. If you are not sure what a job needs, describe what you want to be able to do in each room, and we work out the points with you.

Photos to send an electrician

JobPhotos to send
New or moved pointsThe room, and the wall where each point goes, with a mark or a note
Switchboard upgradeThe switchboard with its door open, the meter, and a note of what is being added
EV chargerThe switchboard, the meter, the parking spot and the wall the charger goes on
FaultsThe switchboard showing which switch has tripped, and a note of when it happens
Kitchen or bathroomThe plans or a sketch, and the appliance list
Shop or office fit-outThe fit-out plans, and a list of the equipment that needs power

Opening the switchboard door is enough for a photo. Do not remove switchboard covers, socket faces or light fittings, and do not touch anything inside the board.

How to describe an electrical fault

A fault is found faster when we know its pattern. Tell us:

  • which switch in the switchboard trips, or which points have stopped working
  • when it happens: all the time, when a particular appliance is on, or after rain
  • what changed recently: new appliances, building work or other electrical work
  • whether anything smells of burning, is hot or has marks around it

Shops and offices

For commercial work, add the fit-out drawings, a list of the equipment that needs power with each item's rating from its rating plate or specification, the opening date, and the landlord's or building manager's rules for contractors. Say if the work has to be done outside trading hours.

Plans for new builds and renovations

Send the current plans as PDFs, with the electrical or lighting plan if there is one, and say which revision they are. If the plans change after the quote, send the new revision and the quote is updated to match. An appliance list helps too: ovens, hobs, rangehoods and heat pumps may each need their own circuit, and their installation instructions state the supply they need. On a new build, the stages that follow the plans are set out in new build electrical stages.

If something is unsafe

What happens next

  1. We read what you sent and ask about anything it does not show.
  2. We quote from the plans or photos, or arrange a site visit first.
  3. Before work starts, we go through the room-by-room list with you, and you confirm it with the quote.
  4. We do the work and test it.
  5. You receive the certificate for the job.

The full process is on how we work, and our phone number and email are on the contact page.

FAQ

Do I need plans to get a quote?

Not for small jobs: photos and a room-by-room description are enough to start. For new builds and renovations, send the plans.

Can you quote without a site visit?

Often, from plans or photos. When they do not show enough, we visit before quoting.

Should I open the switchboard to take a photo?

Open the switchboard door only. Do not remove covers or touch anything inside the board.

What if I am not sure what I need?

Describe what you want to be able to do in each room. We work out the switches, sockets and light points with you, and put them on the list you confirm.

Send an online enquiry or call with the address and what you need. Email plans or photos to info@adamelectrical.co.nz.

Enquiry Call 022 159 8899