What new build work covers
As a new build electrician, we wire houses and apartments from the plans, from the first cable to the certificate. New builds are part of our residential electrical work, and they cover:
- a quote from the plans, with every point counted room by room
- the penetrations through the outside walls for the outdoor lights and sockets, the mains cable, the main earth and the fibre
- rough-in: cables and boxes in place while the frame is open
- the switchboard, and the circuits for lighting, power and fixed appliances
- data points where the plans show them
- fit-off: switches, sockets, lights and appliances connected after the linings
- testing of every circuit, and the Certificate of Compliance
When to bring the electrician into a new build
At the plans, before any electrical work on site. We look at the plans first and give an approximate price, and a formal quote follows. The first work on site is the penetrations, while the frame is open, and each electrical stage after that is timed with your builder's programme.
How a new build runs
- You or your builder send the plans, and we give an approximate price from them; a formal quote follows.
- We list every switch, socket, light point and data point from the plans, room by room.
- You confirm the list and the quote before rough-in is booked.
- Rough-in is done while the frame is open: the penetrations, a point check with you, the boxes and the cabling, then a last point check.
- The light holes and other openings are cut before stopping, fit-off follows the linings in two rounds, and every circuit is then tested.
- You receive the Certificate of Compliance for the installation.
Point checks and fit-off
Both point checks come before the walls are lined, while a point can still be moved easily. Fit-off runs in two rounds. If you want the power on quickly, or the temporary supply taken away, the first round completes, as far as possible, the switchboard, the earth rod, the switches, the sockets and the lights. The kitchen, the bathrooms and other special appliances follow in the second round. Each stage, from the plans to the certificate, is set out in new build electrical stages.
Decisions to make before rough-in
A point is easy to move on the plan and harder to move once the walls are lined, so these go on the list before rough-in:
- the position of each switch, socket and light point
- the lighting in each room, including any LED strip lighting in the kitchen, ceilings or stairs
- data points for each room, and a location for the router or network cabinet
- outdoor lights and sockets
- appliances that need their own circuit, taken from their installation instructions
- a circuit for an EV charger, if one is planned
A new build quote from the plans
The quote is built from the point count: each type of point, room by room, as drawn on the plans. Send the current plans as PDFs, with the electrical or lighting plan if there is one, and say which revision they are. An appliance list helps too: ovens, cooktops, rangehoods and heat pumps may each need their own circuit, and their installation instructions state the supply they need. New builds anywhere in our service area, from the North Shore to South Auckland, are quoted this way. The photos of our retirement village extension show cables run through steel stud framing before the linings go on.
The mains, the main earth and inspection
A new build's electrical work includes the mains cable and the main earth. WorkSafe notes that the law requires some electrical work to be inspected, particularly work on the main switchboard, the main cable and the main earth, and that the electrician you employ arranges a licensed electrical inspector to carry out the inspection. On a new build we arrange it before the power goes on. Under the regulations, mains work, which includes work on the mains and the main earthing system, is high-risk work, and it is not complete until the record of inspection is issued with the Certificate of Compliance.
FAQ
Can you quote from the plans alone?
Yes. We look at the plans and give an approximate price, and the formal quote follows the room-by-room list made from them. If the electrical layout is not drawn yet, we make the list with you from the floor plan.
When are you on site during the build?
For the penetrations and rough-in while the frame is open, with two point checks with you; before stopping, to cut the light holes and openings; and for fit-off, in two rounds. The stages are timed with your builder.
Do I receive a Certificate of Compliance?
Yes. After fit-off, every circuit is tested and you receive the Certificate of Compliance for the installation, with a copy of the record of inspection for the mains work.
Can I move a point after rough-in?
Yes. The move is listed and priced as a change, and done once you confirm. If the walls are already lined, the lining has to be opened at that point.