As a kitchen and bathroom electrician, we plan every point from the cabinet or bathroom drawings, because the appliances, lights and fittings decide where each one goes. Kitchen and bathroom upgrades are part of our residential electrical work.
Kitchen electrical work
- oven and cooktop circuits, and circuits for the other appliances that need their own
- rangehoods installed in full: the hood, its ducting and the wiring
- bench sockets, including on an island
- lighting: downlights, pendants and LED strip under cabinets or in shelving
- switches, sockets and light points moved to suit the new layout
Each appliance's circuit is planned from its installation instructions, which state the supply it needs, and its position is taken from the cabinet drawing. Our FOTILE rangehood installation album shows a hood fitted on a tiled wall, with its duct taken out through a weatherboard wall to an external vent.
Bathroom electrical work
- ceiling lights, and lighting at the vanity and mirror: a fitting over the mirror or a backlit mirror
- extractor fans, placed with their duct
- heated towel rails, with their switch
- electric underfloor heating, with its thermostat
- points moved for the new vanity, shower and mirror positions
In a bathroom, the position of each point near the bath and shower is checked before it goes on the list. Our bathroom renovation album shows a heated towel rail with its switch and controller, LED downlights, a ceiling extractor fan, a light over the mirror and backlit oval mirrors above the vanity. What to plan for a bathroom, and when each stage is done, is set out in bathroom renovation electrical.
New circuits, RCDs and the switchboard
WorkSafe says RCDs should be installed in damp areas of the home where there are electric fittings, such as bathrooms, laundries and kitchens. It also states that it is a legal requirement for all new circuits from the switchboard supplying lighting or socket-outlets in a home to have RCD protection. A new point goes on an existing circuit nearby or on a new circuit from the switchboard, and a new circuit needs room on the board; if there is none, a switchboard upgrade is listed and quoted with the kitchen or bathroom work.
How a kitchen or bathroom job runs
- Send the kitchen or bathroom drawings and the appliance list, or we visit.
- We list every point the room needs: appliance circuits, sockets, switches, lights and fans.
- You confirm the list and the quote, and we agree the rough-in and fit-off dates with you or your builder.
- Cables go in before the linings and cabinets; appliances, lights and fittings are connected once the cabinets, benchtop and tiles are in.
- The appliance circuits and lights are tested before the room is handed back.
- You receive the certificate for the kitchen or bathroom work.
What to have ready
- the appliance list, with the installation instructions for the oven, cooktop and rangehood
- the cabinet drawing, showing where the oven, fridge, rangehood and any island go
- where you want lights and LED strip
- the bathroom layout: vanity, mirror, shower, bath and towel rail positions
- a photo of the switchboard with its door open
Related projects and services
Kitchen and bathroom upgrades are part of our renovations work, and under-cabinet and shelf lighting is covered under LED strip lighting. The photos of our commercial kitchen electrical work show LED downlights over the counter and kitchen, and a distribution board with its circuits labelled. We work on kitchens and bathrooms across our service area, from the North Shore to South Auckland.
FAQ
Does an oven or cooktop need its own circuit?
Usually. Ovens and cooktops are normally wired on their own circuit, sized from the installation instructions before the cabinets go in.
Can you install a rangehood I supply?
Yes, in full: the hood, its ducting and the wiring, as part of our extractor fan and rangehood installation work. Send the model and its installation instructions, and mark its position on the cabinet drawing so its supply is placed there at rough-in.
When do you need to be there during a kitchen renovation?
At two stages: before the cabinets go in, to run the cables, and after the benchtop and splashback are fitted, to connect the appliances, sockets and lights. In a bathroom, the cables go in before the linings, and the fittings are connected once the tiles and vanity are in.