Commercial and warehouse lighting in Auckland

High-bay LED lights for warehouses, and lighting for shop floors and offices, planned with the circuits and cable tray that feed them.

Enquiry Call 022 159 8899

Commercial and warehouse lighting in Auckland

Commercial lighting covers shop floors, offices, storage rooms and warehouse areas. Each light goes on the list with its fitting and the switch that controls it, and the circuits and cable runs that feed the lights are settled at the same time, before the quote. It is part of our commercial electrical work for businesses across Auckland, from the North Shore to South Auckland.

Warehouse lighting installation

Warehouse lighting installation starts from a floor plan with the racking, benches and machines marked: each high-bay light goes on the list for its area, with its fitting and the switch that controls it. Our cable tray project, in a commercial building with a high steel roof, shows high-bay LED lights hung below the roof steel, galvanised and wire basket tray fixed along the roof steel, and the work at roof height done from a scissor lift. Work in a warehouse that stays open can be staged area by area, as our article on planning warehouse lighting sets out.

Shops and offices

Lighting for the shop floor, counters, displays, offices and storage rooms is planned from the fit-out drawings with the rest of the electrical work, and timed around the opening date. Cables go in while the walls and ceilings are open, and the lights follow once the linings and ceilings are finished. Displays and shelving can take LED strip, planned with the shop fit-out. Lighting for homes is covered under lighting and downlight installation.

What the work covers

  • high-bay LED lights in warehouses, hung below the roof steel
  • lighting for shop floors, counters, displays, offices and storage rooms
  • the switches for each group of lights, settled with you before the quote
  • dimming, with each fitting and its dimmer chosen together
  • cable tray for the long cable runs to each area
  • new lighting circuits from the switchboard, added with their protection
  • old fittings replaced, area by area

How a commercial lighting job runs

  1. Send the drawings, the models of the fittings and photos of each area, or we visit the site.
  2. We list every light point area by area, with its fitting and the switch that controls it.
  3. You confirm the list and the quote before the work is booked.
  4. We install the cable tray, the cabling, the switchboard work and the lights in the order the building allows.
  5. Every circuit is tested before it is put into service.
  6. You receive the certificate when the job is finished.

Planning points

  • Dimming: an LED fitting dims properly only with a dimmer that suits it, so each fitting and its dimmer are picked together, before anything is bought.
  • Switching: where the drawings leave open which switch controls which lights, it is settled with you before the quote.
  • Circuits: new lighting circuits start at the switchboard, and the circuits the job adds are checked against the room left in it. Before anything at an existing board is changed, every circuit and what it supplies is listed, so you know which equipment loses power while the board is worked on.

Replacing old warehouse lights with LED high-bays

A replacement can cover only the areas that need it, and the existing circuits are checked before new fittings are chosen. WorkSafe's note on the November 2025 changes to the regulations says existing installations may continue to exist and be repaired so long as they are not unsafe, and that only the parts that are changed need to meet the new standards.

What to send for a quote

  • the drawings, or a floor plan with the racking, benches and machines marked
  • the switch positions marked on the plan
  • the model or specification sheet of each fitting
  • photos of each area, and of the switchboard with its door open
  • your working hours, and the building's rules for contractors

FAQ

Can you install light fittings we have bought?

Yes. Send the model or its specifications, and have the fittings on site, marked by area, before they are installed. Dimmable fittings are matched to their dimmers before the list is confirmed.

Do you issue a certificate for commercial lighting?

Yes, for new light points and new circuits: they are fixed wiring work, certified with a Certificate of Compliance, and an Electrical Safety Certificate follows once the work is connected. For a light fitting replaced in an existing installation, which is low-risk work, the regulations make a Certificate of Compliance optional.

How are lights installed under a high steel roof?

In our cable tray project, the high-bay LED lights hang below the roof steel, and the work at roof height was done from a scissor lift.

Send an online enquiry or call with the address and what you need. Email plans or photos to info@adamelectrical.co.nz.