Adams Apple ElectricalRegistered Electrician in Auckland

COC / ESC

Electrical test sheet app: mains, circuits and earthing

The commissioning test sheet is a tab of each certificate, filled in from number panels and exported as its own PDF.

Start the 30-day free trial Open the app User guide

In COC / ESC the electrical test sheet is not a separate form: it is the Test Sheet tab of the certificate, next to the COC / ESC tab. The location and contact come from the certificate, and the sheet exports as an A4 landscape PDF headed with the logo of the job folder's company.

What the test sheet records

TabWhat is recorded
Mains, single phaseMain earth continuity, polarity, insulation resistance P-N, P-E and N-E, mains EFLI, voltage P-N, P-E and N-E
Mains, three phaseMain earth continuity, polarity, insulation resistance and voltage for R-W, R-B, W-B, R-N, W-N, B-N, R-E, W-E, B-E and N-E, phase rotation, EFLI on R, W and B
CircuitsPer circuit: circuit number, MCB, cable size, IR, RCD number, voltage, EFLI, RCD trip time in ms and trip current in mA
Earthing · SignEarth bonding locations and values, date, client and signature

Values from panels

ValueHow it is entered
Insulation resistance (MΩ)0, >50M, >100M, >250M, >500M, >1000M or >4000M
Continuity, bonding and EFLI (Ω)0.1 to 2.0, in 0.01 steps up to 0.29 and 0.1 steps above
MCBType B, C or D, then 6, 10, 16, 20, 25, 32, 40, 50, 63 or 80 A, written as C20
Cable size0.5, 0.75, 1, 1.5, 2.5, 4, 6 or 10 mm²
Phase rotation123 or 321
VoltageA wheel in volts and tenths that opens where the last reading of that kind stopped

Every panel ends with Custom… for any other value. Polarity is a single tick; on the PDF a ticked polarity prints as Correct. The circuit number and the RCD number, trip time and trip current are typed.

Filling in the test sheet in the app

  1. Open the certificate and tap Test Sheet at the top.
  2. On Mains, choose Single Phase or Three Phase and fill in the mains values.
  3. On Circuits, fill in a card per circuit. A new sheet starts with two empty cards; + Add Circuit adds one with the previous circuit's MCB, cable size and IR.
  4. On Earthing · Sign, enter the bonding values. Studs, shower tray and benchtop are listed to start, and locations can be added or removed. Then enter the date and the client, and sign.
  5. Tap Export PDF in the top bar.

The client defaults to the first line of the certificate's contact details. Bonding locations left without a value are left off the PDF.

Why the test sheet sits inside the certificate

Results written on a separate sheet have to be matched to the certificate later, and figures copied from a notebook can be copied wrongly. On the tab of the certificate, each result is entered once, next to the certificate it belongs to. In the same job folder, a new certificate keeps the mains values from the last one, while the circuits, bonding values, date and signature start empty, because every certificate has its own.

What the regulations require about testing is covered in the commissioning test sheet guide. The certificate itself is described under COC and ESC, and the logo at the top of the sheet comes from companies.

FAQ

Is the test sheet a separate document?

In the app it is a tab of the certificate. It exports as its own PDF from the Test Sheet tab.

Does a new certificate copy the last test sheet?

Only the mains values, and only within the same folder. Circuits start as two empty cards, bonding values, the date and the signature start empty, and polarity starts ticked.

What if a reading is not on the panel?

Every panel ends with Custom…, where any value can be typed.

Whose logo is on the test sheet PDF?

The logo of the company the job folder uses, top left, with that company's name and Test Sheet as the title. Without a logo, the company's brand letters are used.