Adams Apple ElectricalRegistered Electrician in Auckland

Guides for electricians

Electrical walkthrough checklist for electricians

Walk the job with the client room by room, list every switch, socket and light point, and have the list confirmed before any work starts.

Updated 2026-11-13

An electrical walkthrough checklist, or electrical client checklist, is a list of every point on a job, made room by room with the client and confirmed before the work starts. Every job of ours starts with one. The quote is built from the list and the work follows it, so the two match. The whole process is set out on how we work.

Why walk the job with the client

A quote describes a job in totals. A walkthrough shows the client what those totals mean on their walls and ceilings: this socket, that light, the switch by this door. Points that were assumed, forgotten or understood differently come up while you are standing in the room, not when the final invoice arrives.

The confirmed list also gives every later change a reference. Anything added, moved or removed after confirmation is a variation, priced and confirmed on its own; see variations on electrical jobs.

Before the walkthrough

  • Bring the latest plans with their revision, and the points already counted from them. The method is in quoting electrical work from plans.
  • Agree who confirms the list. That person should be at the walkthrough.
  • Fix the room order before you start: the entrance first, then each room in turn, outdoor and whole-house items last.
  • Have a way to file photos by room.

What to record in each room

PointWhat to record
Light pointsType (downlight, pendant, batten, strip), quantity, which switch controls them, dimming
SwitchesPosition, number of gangs, any light switched from two places
SocketsSingle or double, quantity, position, any above a bench or behind a TV
Data and TVNumber of data and TV points, and where each one goes
AppliancesOven, hob, rangehood, heated towel rail, extractor fan, heat pump: what each needs and where
Existing pointsWhat stays, what moves, what is removed
Notes and photosHeights, positions against joinery, anything a count cannot show

Record quantities as numbers and positions as notes. "Two double sockets, one each side of the bed" is a record. "Sockets as discussed" is not.

How to walk a room

  1. Stand at the door and start with the switches beside it.
  2. Go round the walls in one direction and note every socket, data and TV point.
  3. Count the light points on the ceiling, then note which switch controls each group.
  4. Note the appliances and fixed equipment, and what each one needs.
  5. Take a photo wherever a position matters more than a number.
  6. Read the room back to the client before moving to the next one.

Outdoor points go in their own section after the rooms: wall lights, outdoor sockets, garden lighting. So do whole-house items: switchboard changes, a data cabinet, an EV charger circuit, alarm and camera pre-wire. Listed inside a room, they are easy to miss.

The client confirmation form

After the walkthrough, the list becomes a document the client confirms. It shows:

  • the job address and the date of the walkthrough
  • each room with its points and quantities
  • a total of each point type across the job
  • notes on positions, and on what is not included
  • the client's name and signature, or a written reply confirming it

Send it with the quote. The quote is built from the same counts, so the client can check any line of the price against a line of the list. Work starts only when both are confirmed. Keep the confirmed version unchanged: later changes go on variations, not over the original.

Why it prevents disputes

  • The client has seen every point before any cable is run.
  • The quote and the list use the same counts, so a question about the price has a traceable answer.
  • The electrician on site works from the list, not from memory of a conversation.
  • A change has something to be measured against.

FAQ

Do I need plans to do a walkthrough?

No. Rooms can be listed on site. With plans, the points are counted beforehand, and the walkthrough becomes a check of positions and quantities.

Who should be at the walkthrough?

The person who will confirm the list and the quote. If someone else decides on fittings or positions, they should be there too.

What if the client changes something after confirming?

Record the change as a variation against the confirmed list, with its price, and have it confirmed before doing the work.

Does the client have to sign the form?

The list needs a written confirmation, so that there is one agreed version. A signature on the form or a written reply confirming it both give you that.