How to quote electrical work from plans

Count every point by room, cost each point type, add what the plans do not show, and keep one quote number through every revision.

Updated 2026-11-13

Quoting electrical work from plans comes down to two things: an accurate electrical takeoff, counting every point room by room, and a consistent cost for each type of point. This is the method we use on our own jobs.

What you need before you start

  • the current plan set as PDFs, with the revision and date of each sheet
  • the electrical or lighting plan if there is one, and the kitchen and joinery drawings
  • the client's brief: who supplies the light fittings, the appliance list, data, TV and any alarm or camera wiring
  • a list for questions, because every plan set leaves something out

The method, step by step

  1. Load the plan and note the revision you are quoting from. The quote will name it.
  2. Check the scale against a dimension printed on the plan before measuring anything.
  3. Outline each room and name it as the plan does.
  4. Mark every point with its type: switches by number of gangs, single and double sockets, each kind of light, data, TV, fans and appliance points.
  5. Count by room and by type, and check the totals against the plan's legend if it has one.
  6. Add what the plan does not show: switchboard work, long cable runs, outdoor points and whole-house items.
  7. Cost each point type from its rough-in minutes, fit-off minutes and materials.
  8. Add the job-level items: site visits, and an uplift where conditions slow the work.
  9. Write the quote, attach the room-by-room list, and send both.

Count by type, not by total

A count of "45 points" cannot be priced or checked. A single switch and a three-gang switch, a single socket and a double socket, a downlight and a pendant each take different time and materials. Keep one line per type as it appears on the plan, so the count, the cost and the purchase list use the same names.

Room outlines matter for the same reason. When every point belongs to a room, the client can check the quote room by room against the plan, and the walkthrough later confirms the same list; see the client walkthrough checklist.

What plans often leave out

Not on the planWhy it mattersWhat to ask
Switchboard position, or the existing boardNew circuits need space and protectionWhere it goes, or photos of the existing board
Appliance detailsOvens, hobs and heat pumps may each need their own circuitThe appliance list and installation instructions
Light fitting typesFit-off time and materials change with the fittingWho supplies them, and which kind
DimmingIt decides the switch, the dimmer and the driverWhich lights dim
Outdoor pointsExterior and garden lights are often on another sheetA site plan or a sketch
Data, TV, alarm and camerasThe cabling goes in before the liningsHow many points, and where the router or data cabinet goes

Measuring runs

Points are counted; some cable runs are measured. Measure the runs that change the price: a submain to a garage or outbuilding, a long feed, an EV charger circuit, outdoor lighting. A PDF measures true only if it was produced to scale and has not been resized since, which is why the scale check comes first. If the plan is not to scale, count from it, but take run lengths from the printed dimensions or on site.

Versions when the plans change

Plans change between the quote and the build. Keep the same quote number and issue a new version, V2, then V3, each naming the plan revision it is based on. The client can see what changed, the earlier version stays on record, and only the current version is open for acceptance. After the client confirms the list and the quote, a change is a variation. Payment stages go on the quote as well; see progress invoicing for electricians.

FAQ

Can you quote accurately from plans without a site visit?

For a new build, the plans show what is needed to count and cost the points. For work on an existing building, a visit or photos show what plans cannot: the existing switchboard, access and finished linings. We quote from plans, or after a site visit.

What if the plans are not to scale?

Count the points from them as normal. Take cable run lengths from the printed dimensions, or measure on site.

How should I handle a plan revision after quoting?

Issue a new version under the same quote number, name the revision it is based on, and mark the earlier version so it cannot be accepted by mistake.

Should the point list go to the client with the quote?

Yes. With the room-by-room list, the client can check every count against the plan before accepting.