Adams Apple ElectricalRegistered Electrician in Auckland

Client Check

Electrical estimating: minutes, materials, purchase list

Labour minutes and material cost per point type give the cost of each unit, and the same counts give the purchase list.

Start the 30-day free trial Open the app User guide

The cost page does the electrical estimating and job costing in Client Check. It multiplies the counts on the checklist by your own minutes and material costs, and it is for you: the client sees the quote.

What Client Check does for estimating

  • keeps a labour and cost library: rough-in minutes, fit-off minutes and material cost for each point type, each switch and data mech, and each whole-house item
  • takes an hourly rate for each unit
  • adds site visits, and a difficulty uplift as a percentage
  • totals rough-in hours, fit-off hours, labour and materials
  • prints a cost PDF, and a detailed version for your own records
  • prints the purchase list as a PDF or an Excel workbook for a unit, and as one Excel workbook for a whole folder

How to cost a unit in Client Check

  1. Fill in the labour and cost library once. Every number is yours; the app does not fill in prices or minutes.
  2. Open a unit's cost page. The rows come from the checklist, grouped indoor, outdoor and whole-house, each with its quantity.
  3. Enter the unit's hourly rate, the number of site visits and any difficulty uplift. The cost of a visit is set in the library.
  4. Change a row's minutes or materials on the page and the change applies to that unit only; clear it and the library number comes back.
  5. A name with no numbers yet shows as Unset, in red. The first numbers you enter for it are saved to the library.
  6. Export the cost PDF and the purchase list.

Why minutes per point matter

A price per point set by feel can be a few minutes short on every point, and on a large job those minutes add up to days. Splitting each point type into rough-in and fit-off minutes shows where the time goes: the rough-in before the linings, the fit-off after. Site visits and the difficulty uplift cover what the point count does not, such as extra trips to site or a hard ceiling space. The purchase list comes from the same counts, so what you order matches what you quoted.

Where each number is set

NumberSet in
Rough-in and fit-off minutesthe library, or changed for one unit
Material costthe library, or changed for one unit
Hourly rateeach unit
Site visitseach unit; the cost per visit in the library
Difficulty uplifteach unit, as a percentage

The rows come from the room checklist, the client's price goes on the quote, and quoting electrical work from plans sets out the method.

FAQ

Does Client Check come with labour rates or prices?

No. Every minute, material cost and hourly rate is entered by you, so the cost follows how you work.

Does the client see the cost page?

No. The cost page is your own costing; what the client receives is the quote.

What does the purchase list contain?

Each item on the unit's checklist with its quantity and cost, as a PDF or an Excel file. For a whole folder, the Excel file gives each unit its own column, with the totals.

Are rows set to Off counted?

No. A row set to Off shows greyed on the cost page and is not counted.

Try Client Check free for 30 days

Register with your email, add a card on the account page and start the trial. Cancel during the trial and nothing is charged.

Register app@adamelectrical.co.nz