Adams Apple ElectricalRegistered Electrician in Auckland

Client Check

The electrical checklist app, room by room

Every room's points and quantities, from the drawing or added by hand, ready for the client to confirm before work starts.

Start the 30-day free trial Open the app User guide

The checklist is the centre of Client Check: an electrical checklist of every room, with every switch, socket and light point and its quantity. It is the list the client confirms before work starts, and the list the cost, quote and invoice are built from.

What the room checklist does

  • takes its rooms from the outlines on the drawing, with quantities that follow the plan
  • adds rooms by hand, filled with the default points of their room type
  • takes its points from one point library, the same types the drawing, the room types and the cost library use
  • has an outdoor block for points outside the house, and a whole-house block for items such as an alarm, audio or camera system or a switchboard upgrade
  • adds variation orders from your own catalogue
  • puts photos on any row, and sets any row to Off with one tap
  • prints the client confirmation form as a PDF

How to build the checklist in Client Check

  1. Outline the rooms on the plan, or add rooms by hand and pick a room type.
  2. Check each room. Quantities from the drawing change when the drawing changes; a row you add by hand is marked as manual and the drawing leaves it alone.
  3. Add outdoor points and whole-house items, and pick variation orders from your catalogue with their type, quantity and discount.
  4. Set any row you want off the documents to Off: it stays on the list, greyed, and its count still follows the drawing.
  5. Export the client confirmation form and go through it with the client before work starts.

Why the client confirms the list before work starts

A common argument on a residential job is over a point the client thought was included. A list made room by room, with every switch, socket and light point counted and confirmed by the client before the first cable is run, settles that before it starts. When the client asks for more during the job, the extra goes on as a variation order, priced from your own catalogue and kept apart from the confirmed scope. Running a client walkthrough and variations on electrical jobs set out the method.

What the client confirmation form shows

SectionWhat it lists
Headeryour company and logo, the job name, address, date and who checked it
Whole-houseitems such as the alarm, audio system or switchboard upgrade
Roomsevery point in each room, switches and data plates with their gangs and mechs
Quantity summarytotals for indoor, outdoor and whole-house
Variation orderseach item with quantity, unit, price, discount and GST
Signaturea place for the client to sign

The rows come from the drawing and points page, and photos can go on any of them.

FAQ

Can I make a checklist without a drawing?

Yes. Add rooms by hand; each room type brings its default points, which you then adjust.

Do room-type defaults mix with points from the drawing?

No. Room-type defaults go only into rooms added by hand. When points from the drawing land in such a room, its default rows drop out, and rows you added yourself stay.

What does Off do to a row?

The row stays on the checklist, greyed, and its quantity keeps following the drawing. It is left out of the client confirmation form, the room and unit photo PDFs, the quote and invoice lines and the cost. The drawing and its PDF are not affected.

Where do variation orders come from?

From your own catalogue in the settings. Each item has its types, such as pre-wire or supply and installation, each with its own price, and a unit such as set or house.

Try Client Check free for 30 days

Register with your email, add a card on the account page and start the trial. Cancel during the trial and nothing is charged.

Register app@adamelectrical.co.nz