COC vs ESC in New Zealand: what each certificate covers

A Certificate of Compliance certifies the electrical work; an Electrical Safety Certificate certifies that the connected installation is safe to use (Electricity (Safety) Regulations 2010, r 4).

Updated 2026-11-13

Certificate of Compliance vs Electrical Safety Certificate

The difference between a COC and an ESC is what each one certifies. Both come from the Electricity (Safety) Regulations 2010 (ESR). A Certificate of Compliance (COC) certifies that prescribed electrical work on an installation was done lawfully and safely (ESR rr 4, 65). An Electrical Safety Certificate (ESC) certifies that an installation connected to a power supply is safe to use (ESR rr 4, 74A).

What a COC is

The person issuing a COC states that they are satisfied the work was done lawfully and safely, and that the information on the certificate is correct (ESR r 66(1)(a)). "Lawfully and safely" has a set meaning (ESR r 66(2)):

  • the work was done as the regulations require
  • the testing the regulations require has been satisfactorily completed
  • the installation is electrically safe
  • the work has not adversely affected the safety of the rest of the installation

A COC carries the authentication mark (ESR rr 66(1)(c), 111B). Any manufacturer's instructions, supplier declarations of conformity (SDoCs) and certified designs used are attached, or the certificate says where they can be found electronically (ESR r 66(1)(d), (3)). Among other things, it records (ESR r 67):

  • the location, a description of the work and the date or dates it was done
  • the issuer's name, registration number and signature, and the names of anyone who did the work under their supervision
  • whether a certified design was followed or manufacturer's instructions relied on, and which other standards were complied with
  • the type of supply system it is safe to connect to, and which parts are safe to connect

Test results are not a required field. The issuer may add them as additional information (ESR r 67(3)), which is where a commissioning test sheet comes in.

What an ESC is

The person who completed the work issues the ESC once they are satisfied the installation is safe to use (ESR r 74A(1)). If the supply was disconnected during the work, the work is complete only once the installation is reconnected (ESR r 74A(2)).

An ESC states whether it covers the whole installation or only specified parts, and gives the location, the date of connection, the authentication mark, signatures and registration numbers (ESR r 74A(3)). It is issued as soon as practicable after connection, and no later than 20 working days after it (ESR r 74C). Under section 19(1)(e) of the Building Act 2004, an ESC counts as confirming that the work complies with the building code (ESR r 74A(5)).

Who issues each certificate

  • COC: only a person authorised to certify that particular work, or authorised under the system of an employer licence (ESR r 68). Authorisation comes from registration with a current practising licence, or from a provisional or employer licence, under section 74(2) of the Electricity Act 1992 (EA).
  • ESC: the person who completed the work, signed by whoever did the connection and by their supervisor if they were supervised (ESR r 74A(1), (3)(f)). When a meter installer, lines worker or inspector does the connection, WorkSafe says that person completes the ESC. A trainee cannot sign an ESC off alone, as the Electrical Workers Registration Board (EWRB) sets out in its certification documentation notice.
  • Record of Inspection (RoI): for high-risk work, an authorised inspector who did not do, supervise or certify the work (ESR r 71).

Which work needs which certificate

The paperwork follows the risk category of the work (ESR r 6A). The EWRB's paperwork guide sets out the same matrix.

CategoryCOCRecord of InspectionESC (ESR r 74A)
Low-risk: maintaining or replacing a fitting in an existing installation (ESR r 6A(1))Optional (ESR r 65(2))Not requiredRequired
General: work that is neither low-risk nor high-risk, such as new circuits, alterations and rewires (ESR r 6A(3); EWRB)Required; the work is not complete until it is issued (ESR r 65(1), (3))Not requiredRequired
High-risk: includes mains work, PV systems and mains parallel generation (ESR r 6A(2))Required; the work is not complete until the COC and RoI are issued (ESR r 65(4))Required, from an independent inspector (ESR rr 70–72)Required

The full scope of each category is in prescribed electrical work and its risk categories.

Where the two certificates meet: connection

Before connecting a low or extra-low voltage installation after prescribed electrical work, the person doing the connection must be satisfied that it is safe to connect and that the required testing has been done. Where a COC is required, they issue one or sight one issued no earlier than 6 months before connection, plus the RoI where the work had to be inspected (ESR r 73A(1)). The Electricity Act bars connection until the required testing, certification and inspection have been carried out (EA s 82(1)).

The combined COC and ESC certificate

An electrician who connects their own work can use a combined COC–ESC (WorkSafe). It must meet the requirements of both certificates, but each detail only needs to be recorded once (WorkSafe certificate templates).

Copies for the client

DocumentCopy due
COCwithin 20 days after completing the work (ESR r 74E(2))
ESCwithin 20 working days after it is issued (ESR r 74G(1)(a))
RoIwithin 20 working days after it is issued (ESR r 72A(1)(a))

The COC period is 20 days, not 20 working days. The COC and ESC go to the person who contracted for the work, or to the owner or occupier if that person is not readily available (ESR rr 74E(2), 74G(1)(a)). Since 15 January 2026, for a non-consented small stand-alone dwelling, they go to both the person who contracted for the work, if readily available, and the owner of the dwelling (ESR rr 74E(2A), 74G(1)(a)). Copies are kept for at least 7 years (ESR rr 74E(3), 74G(1)(b)); see keeping certificate records.

FAQ

Is a COC the same as an ESC?

No. A COC certifies that the prescribed electrical work was done lawfully and safely (ESR r 65). An ESC certifies that the installation, once connected to a power supply, is safe to use (ESR r 74A).

Does every job need a COC?

A COC is required for general and high-risk work and optional for low-risk work (ESR r 65(1), (2)). An ESC is required in all three categories (ESR r 74A).

Who can issue an ESC?

The person who completed the work, once satisfied that the installation is safe to use (ESR r 74A(1)). Whoever did the connection signs it, and so does their supervisor if they were supervised (ESR r 74A(3)(f)). When a meter installer, lines worker or inspector does the connection, WorkSafe says that person completes the ESC.

When does the client receive the certificates?

The COC within 20 days after the work is completed (ESR r 74E(2)), and the ESC within 20 working days after it is issued (ESR r 74G(1)(a)).

Can one form serve as both certificates?

Yes, when the electrician connects their own work. A combined COC–ESC meets the requirements of both, with each detail recorded once (WorkSafe).