What is prescribed electrical work in NZ?

The Electricity (Safety) Regulations 2010 list the work on conductors, fittings and appliances that counts as prescribed electrical work, and place it in one of three risk categories that decide the paperwork (rr 6, 6A, 65).

Updated 2026-11-13

What prescribed electrical work means

Prescribed electrical work in New Zealand is electrical work of a type described in clause 1 of Schedule 1 of the Electricity (Safety) Regulations 2010 (ESR), unless it is work of a type described in clause 2 (ESR r 6). Clause 1 lists (ESR Sch 1 cl 1(1)):

  • installing, connecting or maintaining conductors used in works or installations
  • installing, connecting or maintaining fittings that are connected, or intended to be connected, to those conductors
  • connecting or disconnecting fittings to or from a power supply, other than by a plug or pin inserted into a socket, or an appliance connector inserted into an appliance inlet
  • maintaining appliances
  • the testing of that work that the regulations require, and the certification, inspection and supervision of prescribed electrical work (ESR Sch 1 cl 1(1)(e)–(h), r 65(6))

Clause 2 lists work that is not prescribed electrical work. It includes work on low voltage fittings that consists of replacing a fuse link or fitting a plug to a flexible cord, when done to ECP 51 and without payment or reward (ESR Sch 1 cl 2(a)). It also includes repairing or adjusting fittings, or replacing them with the same or comparable fittings, when the work can be done without exposure to live parts above extra-low voltage (ESR Sch 1 cl 2(d)).

Three categories

Prescribed electrical work falls into one of three risk categories under regulation 6A of the ESR: low-risk, general or high-risk. The category decides whether a Certificate of Compliance (COC) is optional or required, whether the work must be inspected, and when the work counts as complete (ESR rr 65, 70). In every category, an Electrical Safety Certificate (ESC) is issued for the installation (ESR r 74A).

Low-risk work

Low-risk prescribed electrical work is the maintenance or replacement of a fitting in an existing installation. It includes moving or extending a conductor so that the fitting can be replaced (ESR r 6A(1)).

A COC is optional: the person doing low-risk work may issue one but is not obliged to (ESR r 65(2)). An ESC is still required (ESR r 74A).

General work

General prescribed electrical work is any prescribed electrical work on an installation that is neither low-risk nor high-risk (ESR r 6A(3)). The Electrical Workers Registration Board (EWRB) gives new circuits, alterations and rewires as examples.

A COC is required, and the work cannot be treated as complete until it is issued (ESR r 65(1), (3)). An ESC follows (ESR r 74A).

High-risk work

High-risk prescribed electrical work includes mains work on an installation, and installing, or adjusting the settings of, any of the following (ESR r 6A(2)):

  • a photovoltaic (PV) system in an installation
  • a mains parallel generation system in an installation
  • an installation that does not comply with Part 2 of AS/NZS 3000
  • an installation that operates at high voltage, with some exceptions
  • an installation in a hazardous area
  • an installation for use with electrical medical devices

Some mining, railway-signalling and animal-stunning work is high-risk as well (ESR r 6A(2)).

A COC is required, and the work is not complete until the COC and the Record of Inspection (RoI) are issued (ESR r 65(4)). The inspection is carried out by an authorised inspector who did not do, supervise or certify the work (ESR rr 70, 71). The inspector prepares the RoI (ESR r 72) and lodges the details of the work on the high-risk database within 20 working days after the date of the RoI (ESR r 74F). An ESC follows (ESR r 74A).

Paperwork by category

CategoryCOCRecord of InspectionESC (ESR r 74A)
Low-risk (ESR r 6A(1))Optional (ESR r 65(2))Not requiredRequired
General (ESR r 6A(3))Required; the work is not complete until it is issued (ESR r 65(1), (3))Not requiredRequired
High-risk (ESR r 6A(2))Required; the work is not complete until the COC and RoI are issued (ESR r 65(4))Required, from an independent inspector who lodges the details within 20 working days (ESR rr 70–72, 74F)Required

The EWRB's paperwork guide sets out the same matrix. What each certificate contains, and who issues it, is in COC vs ESC. Each certificate and record is kept for at least 7 years (ESR rr 74E(3), 74G(1)(b), 72A(1)(b)); see keeping certificate records.

Testing and connection

All prescribed electrical work on a low or extra-low voltage installation must be tested (ESR r 63(1)):

  • for operational safety
  • to ensure the installation is not electrically unsafe
  • as regulation 59 or 60 requires
  • for an installation that does not comply with Part 2 of AS/NZS 3000, by the verification or testing process in its certified design

Failing to test is an offence (ESR r 63(3)). Prescribed electrical work on a high-voltage installation is tested under regulation 38 (ESR r 64).

Before the installation is connected, the person doing the connection must be satisfied that it is safe to connect and that the required testing has been done. Where a COC is required, they issue one or sight one issued no earlier than 6 months before connection, plus the RoI where the work had to be inspected (ESR r 73A(1)). Under the Electricity Act 1992 (EA), the work must not be connected until the testing, certification and inspection the regulations require have been carried out (EA s 82(1)). Why the results are kept in writing is covered in the commissioning test sheet.

Two exceptions

Work a homeowner does under the exemption in section 79 of the EA is not placed in any risk category, unless regulation 57 requires it to be certified (ESR r 6A(4)). Installations whose owner or operator runs a maintenance management system that records the information the certificates would hold are an exception to the COC and ESC requirements (ESR rr 65(7), 74B).

FAQ

What is considered prescribed electrical work?

Electrical work of a type described in clause 1 of Schedule 1 of the ESR that clause 2 does not exclude (ESR r 6). Clause 1 covers installing, connecting or maintaining conductors and the fittings connected to them, connecting or disconnecting fittings other than by a plug, pin or appliance connector, maintaining appliances, and the required testing, certification, inspection and supervision of that work (ESR Sch 1 cl 1(1)).

What are the three categories of prescribed electrical work?

Low-risk, general and high-risk (ESR r 6A). Low-risk work is maintaining or replacing a fitting in an existing installation. High-risk work is the listed work, such as mains work and PV systems. General work is all other prescribed electrical work on an installation (ESR r 6A(3)).

Is a COC needed for low-risk work?

It is optional. The person doing the work may issue a COC but is not obliged to (ESR r 65(2)). An ESC is still required (ESR r 74A).

Who inspects high-risk work?

An authorised inspector who did not do, supervise or certify the work (ESR r 71). The inspector completes the Record of Inspection and lodges the details on the high-risk database within 20 working days (ESR rr 72, 74F).

When is the work complete?

General work is not complete until the COC is issued (ESR r 65(3)). High-risk work is not complete until the COC and the Record of Inspection are issued (ESR r 65(4)).