Progress invoicing and GST for electricians

Set the payment stages on the quote, issue one stage at a time with GST at 15%, and show on every invoice what has been paid and what is still due.

Updated 2026-11-13

Progress invoicing splits the price of a job into stages, each invoiced when the work reaches it. On a new build or a large renovation, cable and materials are paid for weeks before fit-off, and staged invoices keep payment in step with the work. Each stage is worked out excluding GST, and New Zealand GST at 15% is added on that stage's invoice.

Set the stages on the quote

Stages agreed at the start do not have to be negotiated at each invoice. Put them on the quote, so the client accepts the price and the payment plan together. For each stage, write:

  • what it is for, in words the client recognises: deposit, rough-in, fit-off, final
  • what triggers it: a point both sides can see, such as cabling complete before the linings go up
  • its amount: a percentage of the total excl GST, or a fixed amount

Make the last stage the remainder rather than a percentage. The stages then always add up to the quoted total, and any rounding ends up on the final invoice.

An example stage plan

StageIssued whenAmount
1. DepositThe quote is acceptedA percentage or a fixed amount
2. Rough-inCabling and boxes are in, before the liningsA percentage
3. Fit-offSwitches, sockets and lights are fittedA percentage
4. FinalTesting is done and the job is completeThe remainder

The triggers follow the new build electrical stages. Rough-in and fit-off are also costed separately when quoting from plans, so each stage amount can be checked against the work it pays for.

Working out GST on each stage

Work each stage out excluding GST, then add GST at 15%:

  • stage amount excl GST = the percentage × the total excl GST, or the fixed amount
  • GST on this invoice = the stage amount × 15%
  • amount due on this invoice = the stage amount + GST

Each invoice shows these three figures for its own stage. Across all the stages, the amounts excl GST add up to the quote's total excl GST, and the GST adds up to the quote's GST, give or take a cent of rounding.

What each progress invoice shows

  • the invoice number and date, and the quote it belongs to
  • the stage, named and numbered, for example "Stage 2 of 4: rough-in"
  • the stage amount excl GST, the GST at 15% and the amount due
  • the invoices issued before it, and what has been paid
  • the balance of the job after this invoice
  • the due date and the payment details

Issue one stage at a time

  1. When a trigger is reached, issue that stage's invoice with its own number and date.
  2. When a payment arrives, record it against its stage straight away.
  3. Check that the amount paid and the balance still due add up to the quoted total, plus any approved variations.
  4. Issue the next stage only when its trigger is reached.

An invoice issued early asks the client to pay for work they cannot see. Holding each stage to its trigger means every invoice matches work the client can see.

Track paid and due

On every job, these should be known at any moment:

  • the quoted total, excl GST and incl GST
  • each stage: issued or not, paid or not
  • the amount paid so far
  • the amount still due

The amount due on the current invoice and the balance of the whole job are different figures. Show both, labelled, so neither side confuses them.

Variations on a progress invoice

Approved variations are priced separately from the quote. Invoice them as a stage of their own or add them to the next stage, but keep them on separate lines so the original price and the changes can each be checked; see variations on electrical jobs.

FAQ

How is GST shown on a deposit invoice?

Like any other stage: the deposit amount excl GST, GST at 15% on it, and the total due.

Can the stages change after the quote is accepted?

If both sides agree, confirm the new stages in writing. Keep the last stage as the remainder so the total still adds up.

What if the client pays part of an invoice?

Record the amount received. The next invoice shows it as paid and carries the difference in the amount still due.

Do variations go on a progress invoice?

They can, as separate lines or as a stage of their own, so the original price and the changes both stay visible.

When is the final invoice issued?

When testing is done and the job is complete. It is the remainder of the quoted total, plus any approved variations not yet invoiced.